What do you know about Lockwood, Andrews & Newnam?

Flint office: 1311 S. Linden Road, Suite B Flint, MI 48532 P 810.820.2682  F 810.820.2703

http://www.lan-inc.com/

Timeline: Lockwood, Andrews & Newnam

May 3, 2016. Missing Flint water plant engineering report surfaces. Detroit Free Press. "The six-page report includes a range of upgrades recommended to prepare the Flint Water Treatment Plant for treating Flint River water on an interim basis."

August 27, 2015. Operational Evaluation Report: City of Flint Trihalomethane Formation Concern. Lockwood, Andrews and Newnam. 

October 23, 2014. Resolution Authorizing Change Order #3 to the Lockwood, Andrews & Newnam Contract for the Implementation of Water Plant Operations. City of Flint, Darnell Earley, Emergency Manager.

August 22, 2013.  James Redding of Rowe Professional Services, emails to MDEQ district engineer Mike Prysby a report titled, "Proposed scope of upgrades to Flint WTP." Rowe is a subcontractor to LAN.

June 26, 2013. Resolution Authorizing Approval to Enter into a Professional Engineering Services Contract for the Implementation of Placing the Flint Water Plant into Operation. City of Flint, Edward J. Kurtz, Emergency Manager. "The City of Flint requires professional engineering services for assistance in placing the Flint Water Plant into operation using the Flint River as a primary drinking water source for approximately two years and then converting to KWA delivered lake water when available at a cost of $171,000.00."